Building work
The building regulations 2010 define 'building work' as:
- The erection or extension of a building.
- The provision or extension of a controlled service or fitting in or in connection with a building.
- The material alteration of a building, or a controlled service or fitting, as mentioned in paragraph.
- Work required by regulation 6 (requirements relating to material change of use).
- The insertion of insulating material into the cavity wall of a building.
- Work involving the underpinning of a building.
- Work required by regulation 22 (requirements relating to a change of energy status).
- Work required by regulation 23 (requirements relating to thermal elements).
- Work required by regulation 28 (consequential improvements to energy performance).
Ref http://www.legislation.gov.uk/uksi/2010/2214/regulation/3/made
NB Manual to the Building Regulations: A code of practice for use in England, published by HM Government in July 2020, suggests building work includes: ‘…erecting or extending a building, providing or extending a controlled service or fitting in or in connection with a building, and the material alteration of a building or a controlled service or fitting.’
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Many resources for visitors aswell as new features for members.
Using technology to empower communities
The Community data platform; capturing the DNA of a place and fostering participation, for better design.
Heat pump and wind turbine sound calculations for PDRs
MCS publish updated sound calculation standards for permitted development installations.
Homes England creates largest housing-led site in the North
Successful, 34 hectare land acquisition with the residential allocation now completed.
Scottish apprenticeship training proposals
General support although better accountability and transparency is sought.
The history of building regulations
A story of belated action in response to crisis.
Moisture, fire safety and emerging trends in living walls
How wet is your wall?
Current policy explained and newly published consultation by the UK and Welsh Governments.
British architecture 1919–39. Book review.
Conservation of listed prefabs in Moseley.
Energy industry calls for urgent reform.
Heritage staff wellbeing at work survey.
A five minute introduction.
50th Golden anniversary ECA Edmundson apprentice award
Showcasing the very best electrotechnical and engineering services for half a century.
Welsh government consults on HRBs and reg changes
Seeking feedback on a new regulatory regime and a broad range of issues.
CIOB Client Guide (2nd edition) March 2025
Free download covering statutory dutyholder roles under the Building Safety Act and much more.